Time and Material Construction Software
The Time and Material Module in FOUNDATION for Windows construction
software allows the markup of job expenses in order to print and
post custom receivable invoices. The system gathers all costs posted
to a customer by job for a specified date range including labor,
Accounts Payable material and inventory, subcontract, equipment,
burden and overhead expenses.
User-defined markups control how costs are calculated. The T/M BillingGenie® enables users to design the format of printed invoices and
select the data to include. Automated posting of generated
invoices to Accounts Receivable prevents user error and makes
the entire process fast and simple.
Click to learn more about these highlights of the
Time and Material Billing Module:
Download more information on our time and material construction software
Simple Workflow
All job history flows directly to the Time and Material Module
in FOUNDATION construction software. As you gather historical data
for billing, it is marked to prevent accidental re-billing. Users
may print and post multiple invoices for multiple jobs through two
simple steps, or you may choose to spend more time modifying, adding
and deleting line-item detail.
Should you choose to delete a line item from an invoice,
the deletion is tracked, allowing for easy re-billing at a
later point. Billing history is stored in both the Time and
Material and Accounts Receivable modules to allow a complete
audit trail. In addition, numerous history reports are available
to backup billings. Time and Material invoices can be completely
rolled back in one quick step.
Back to top
Full Integration
The Time and Material Module serves as a receptacle of costs posted through all other modules. Nothing has to be
entered twice. According to user-defined controls, the billings can include unposted timecards, posted labor, materials, subcontracts,
equipment (whether owned, rented or leased), burden, overhead, and other miscellaneous costs. When the time and
material billing is posted, the income may be recognized in Accounts Receivable, the General Ledger, and Job
Costing, completing the full time-and-material cycle with no additional steps.
Back to top
Automated Cost Tracking
When a billing is created, user-defined controls allow the system to automatically gather just the types of costs
you specify. All posted costs are considered (and unposted payroll and equipment usage may optionally be considered),
and once billed, they are marked as such. Through this process of marking costs and the full date sensitivity of the
system, you can bill costs that were posted into prior periods without worrying about re-billing anything. If a posted cost
is removed from a billing, it is released for later billing, but full user control allows you to indicate which costs
should never be billed.
Back to top
Custom Defined Markups
User-defined cost classes allow categorization of expenses into labor, material, subcontracts, rented
equipment, owned equipment, burden, etc. Markups may be defined based on a fixed billing rate, a percentage
markup or an additional amount. One markup may be defined for the entire category, or the user may breakdown
markups based on infinite detail. For example:
- Labor costs may be marked up per employee, trade, department
or earn code.
- Material and subcontract costs can be marked up per vendor,
inventory category or inventory item.
- Equipment costs can be marked up per category, item or
rate type.
- All costs can be marked up per phase, cost code or cost
class.
All billing rates can be modified per line-item on the actual invoice, and different sets of markups may be
defined per job, customer and/or company, allowing total control over billing.
Back to top
User-Designed Printable Invoices
The T/M InvoiceGenie© features a simple-to-use click-and-drag interface that allows users
to design an unlimited number of printable invoice formats. Designs
may include company, job and customer contact information; user-defined
calculations; comments variable per invoice for each markup section;
and full line-item detail. Billing items can be sorted and grouped
by an unlimited number of detail. For example, group labor costs
by department and date; then sort by date. Group material costs
by inventory category; then sort by cost. The invoice can be formatted
using full color text, graphics and lines.
 |
 |
With the Time and Material Module, the company has not only saved lots of
time tracking labor-hours to specific jobs, but it now has an error-proof procedure for calculating markups and generating
custom invoices.
- Bob Thomason, Controller, Henry Gurtzweiler, Inc. |
 |
This document contains links to Adobe PDF files. In order to view these files you must have the FREE Adobe Acrobat Reader Software. To download, click here.
|
 |
 |
See why contractors use FOUNDATION as their construction accounting software!
(click here) |
|
 |
|
 |
| |
|